Building Statistics.

Building Name | Nova Place Concourse and Amenity Spaces

Location | Allegheny Center, Pittsburgh, PA

Owner | Faros Properties

Occupancy | Various Tenants

Size | Main Building - 2,000,000 SF

         Concourse - 42,000 SF

         Conference Center - 7,500 SF

         Fitness Center - 10,000 SF

Number of Stories | 2 Above Grade + 3 Parking Below Grade

Project Team

        Architect | Perkins Eastman

        MEP Engineer | Allen and Shariff

        Structural Engineer | Atlantic Engineering Services

        Lighting Consultant | Studio i

        Acoustical Consultant | Babich Acoustics

Building Information.

Nova Place is large-scale, mixed-use urban redevelopment project located North across the Allegheny River from downtown Pittsburgh. Part of the redevelopment, the concourse is a renovation of the Allegheny Center Mall into a mixture of public and private space. Around the roughly 40,000 SF public spaces are series of office spaces, part of a separate phase in the project’s timeline. Along with the renovation, the project contains new construction of a plaza and 7,500 SF fitness center. The entire redevelopment attracts modern, technology driven companies and revitalizes the entire area while utilizing a piece of Pittsburgh architecture. For more information click here.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Hunter Mowry. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

09.05.2017

CPEP Home Page Draft

08.28.2017

Attended CPEP Seminar

08.23.2017

Confirmed Master List Information

08.23.2017

Turned in Project Initation Part 2